There was a breach in the pond wall adjacent to the south side foundation of the mill which was growing wider and threatening the mill itself. The pond wall was repaired, the breach filled with stone and the foundation was repointed.
Breach in the dam’s pond wall
Mill foundation adjacent to breach in need of repair
Repointing foundation stones
Pond wall restored and breach filled with stone
Restored mill foundation
Bridge added to easily traverse repaired breach